Originally approx 300off conventional concrete bored piles designed. To limit risk of construction issues associated with a variable water table and contaminated ground Australian Foundation Systems...
A piling solution within budget for all parties was required for a difficult ber school sloping site. Austalian Foundation Systems in conjunction and consultation with Gartner rose and Demlakian...
Australian Foundation Systems carried out the Design, Manufacture, Installation & Certification of the alternative Screw Pile Foundations System including the Pile Caps Design as a cost effective...
Australian Foundation Systems carried out shoring work for existing 132KV substation, the system we have used is Bored & Beam method using 250UC73 Universal column, the geotech condition indicate...